- 200m quay wall with deep 8.5m draft.
- The highest load-bearing platform in Lagos Harbor: 25ton/m2 in specialized areas
- 10 ton/m2 load-bearing reinforced concrete hard standing for fabrication/assembling/testing/load out
- Ducts/piping built into the quay to deliver products directly to vessels
- Fuel tanks (under construction)
- Large, modern warehouses and workshops
- Laydown areas with open storage
- Office buildings (fully furnished)
- Power house
- Sewage treatment plant
- Water treatment plant (delivers water through quay at 60m3/hour)
- 24-hour power, light and security
- Operational canteen
- Hotel with swimming pool, bar, gym and international restaurant
- Fiberoptic cabling & Internet throughout the free zone
- Passenger jetties in Ikoyi and Apapa
Facilities (Left Col)Nov 30th, 2012